Updated weekly

Sourcing board: what I can get you this week

Crushers, batching plants, feed machines and wear parts — what each one does, how long it takes, and the 2026 FOB band. I check this list once a week; a machine may already be gone, so confirm on WhatsApp before you plan around it.

Last checked: 2026-10-04

How to read the status

  • In stockOn the factory floor now — inspection can be arranged this week.
  • In productionBeing built or packed — inspection date on request.
  • Order to buildBuilt to order after the deposit; lead time is on the row.

Mining & crushing

  • PE-600×900 Jaw Crusher

    Order to build
    • 90–180 t/h
    • 75 kW
    • feed ≤500 mm

    Lead time: 20–30 days + sea freightPrice on request

    Check this machine
  • PE-750×1060 Jaw Crusher

    Order to build
    • 110–320 t/h
    • 110 kW
    • feed ≤630 mm

    Lead time: 25–35 days + sea freightPrice on request

    Check this machine
  • PF-1214 Impact Crusher

    Order to build
    • 100–180 t/h
    • 132 kW
    • feed ≤350 mm

    Lead time: 25–35 days + sea freightPrice on request

    Check this machine
  • PYB-1200 Cone Crusher

    Order to build
    • 110–168 t/h
    • 110 kW
    • feed ≤205 mm

    Lead time: 25–35 days + sea freightPrice on request

    Check this machine
  • 3YK-1860 Vibrating Screen

    Order to build
    • 100–240 t/h
    • 3 decks

    Lead time: 20–30 days + sea freightPrice on request

    Check this machine

Concrete & water-stabilised plants

  • HZS50 Concrete Batching Plant

    Order to build
    • 50 m³/h theoretical
    • 33–40 m³/h on site
    • JS1000 · 90–110 kW

    Lead time: 25–40 days + sea freightUSD 28,000–45,000

    Check this machine
  • HZS75 Concrete Batching Plant

    Order to build
    • 75 m³/h theoretical
    • 49–60 m³/h on site
    • JS1500 · 120–150 kW

    Lead time: 30–45 days + sea freightUSD 45,000–70,000

    Check this machine
  • HZS90 Concrete Batching Plant

    Order to build
    • 90 m³/h theoretical
    • 59–72 m³/h on site

    Lead time: 35–50 days + sea freightUSD 80,000–120,000

    Check this machine
  • Water-Stabilised Base Mixing Plant

    Order to build
    • 300–500 t/h
    • 3-bin mobile or 4-bin stationary

    Lead time: 30–45 days + sea freightPrice on request

    Check this machine

Livestock & feed

  • Feed Pellet Machine

    Order to build
    • flat die or ring die
    • electric or diesel drive

    Lead time: 15–25 days + sea freightPrice on request

    Check this machine
  • Hay Chopper / Chaff Cutter

    Order to build
    • cattle, goat and poultry feed

    Lead time: 15–25 days + sea freightPrice on request

    Check this machine

Spare parts

  • Wear Parts Set

    Order to build
    • jaw plates · screen mesh
    • pellet dies & rollers

    Lead time: 7–20 days + sea freightPrice on request

    Check this machine

This board is a sourcing list, not a warehouse. Every line is a machine I can take an order on today; the lead time on each row is production time before sea freight. When a unit is physically in stock or in production I mark it and confirm it again on WhatsApp before you pay anything. Prices are FOB China, 2026 and exclude freight, import duty and VAT.

Want the list every week?

One short WhatsApp message a week: new arrivals, new FOB prices, and what is in production. Reply STOP any time.

Get the weekly list